Key Structures COVID Testing Stations

Busy and safe at the height of the pandemic.

Scope of Works…

Important supplier turned client Key Structures were drafted in at the height of the pandemic to create over space for 60 integrated testing booths for Universities and councils in 7 different London locations.

Better-Green was called on to design and build these internal stations, complete with these crucial considerations :

  • DHSC compliant

  • A Reusable/sustainable product

  • Safety Windows

  • Installed with our teams fully compliant to all COVID working practices

  • Quick to install

All within seven days from brief to install.

Previous
Previous

TV Soundstage & Studio Build